Integration

Incorporating WindWings® onto existing and newbuild vessels

WindWings® and the ship system: We are your expert partner

The process of commissioning, installing and running WindWings® is less complicated than you might think and our team is by your side every step of the way.

1

Feasibility study including bespoke detailed performance analysis based on vessel, routes, and operation profile.

2

Document tailored business case and predicted performance analysis.

3

Select level of BAR supplied integration pack and agree project stakeholders.

4

WindWings® go into production.

5

Vessel integration and class approval process is completed.

6

Foundation/reinforcement prefabrication/new vessel build performed.

7

Wing FAT and delivery.

8

WindWings® are installed.

9

Sea trials are performed.

10

In-service performance monitoring and reporting is completed.

11

Serving and maintenance at agreed intervals.

Focus on safety

Safety is at the heart of our mission. WindWings® have been developed for the highest levels of safety, without requiring additional personnel on board.

DNV – Design Type Approval (other classes to follow)

25-year operational life

Fail-safe behaviour requires zero power so works in all conditions and scenarios

100% redundancy of folding mechanism

Structural monitoring FO gauges installed

Line-of-sight camera replacement solution available

Automated and low maintenance

Crew training and preventative maintenance schedules provided

Digital twin’ remote monitoring and updates available